Tuesday, 19 November 2013

Filming updates and eqipment requests

The filing of my music did not go to plan as due to mine and the artist time schedule it was hard for us to arrange convenient bookings and also ensure that the church building was free for us to go ahead and use.
We decide to film on monday the 18th of November at the agreed location of the church, I booked out equipment from Ms Excel which consisted of a camera tripod and lights. When we reached our chosen destination the girls put on their correct attire and i set up the first floor of the church.


However unfortunately after setting up the location and having the intentions to film, the tripod was missing the shoe of which holds the camera in place, without the shoe for the tripod the footage would not stand still, luckily the church camera was available for us to use of which is imported through an SD card which I had, the filing was then able to take place successfully.  

Sunday, 3 November 2013

Lip syncing tutorial

Lip syncing 

Here is an image of how I applied lip syncing to my final profession audio. The markers which are indicated in green where used to symbolise when it was needed to cut and edit filming to match the audio to make the lip syncing successful. 






I also used a YouTube tutorial to give me extra support when analysing how to perfect my lip syncing from my audio. I found this video extremely helpful as it gave me extra knowledge on how to ensure that even if my lip syncing goes wrong, there are tools available to correct it.